Steel Construction for Businesses and Professionals
Our Technology for Every Scale
The flexibility of the construction system Leaf System enables the realization of complex and large-scale works with unparalleled precision and speed. We support professionals and companies in developing visionary projects, applying our expertise to a wide range of operational contexts.
Translating architectural vision into a building system is our specialty.We engineer the steel structure and solutions to achieve A4 energy class.
02
In-Plant Precision Manufacturing
We work in two modes: we manage the entire production process or we fabricate steel structures from your drawings. Preassembly at the factory reduces time and operations at the construction site.
03
Consulting and Coaching at the Construction Site
We guarantee complete know-how transfer. If the installation is entrusted to you, we provide the technical documentation. Upon request, one of our specialists can be present for advice and supervision of the installation.
Less contingencies, More value.
The advantage your business deserves.
Cost Certainty and Zero Contingencies
Industrial manufacturing precision and pre-assembly eliminate errors and uncertainties. This reduces costs and waste, protecting the marginality of the investment.
Maximum Design Flexibility
The modularity and lightness of CFS steel offer unparalleled creative freedom, especially in complex, serial projects or those requiring elevations.
Acceleration of Time-to-Market
Integrated design and fast dry assembly can reduce construction time by up to 60% compared with traditional methods.
Innovation and Real Estate Value
Our structures, designed for maximum energy (NZEB) and acoustic performance, position your property at the top of the market.
Steel, Wood or Brick? Compare this data
Key criterion
Steel Leaf System
Glulam wood
Traditional (brick/concrete)
Construction time
90-150 days
8-10 months
14-18 months
Earthquake safety
Bracing EN 1998 class II
Good, fears moisture
Vulnerable, heavy structure
Fire resistance
REI 120 native
Mandatory chemical treatments
Good but heavy
Maintenance
Galvanizing 30 years, Zero paint
Annual paints
Plasters, cyclic cracks
Modularity / dismountability
Complete
Limited
None
Green incentives
Up to 45% PNRR / ERDF
Ecobonus 30%
Few
Real Sustainability
100% recyclable
Renewable source
High environmental impact
Typical ROI (return on investment)
3-4 years
5-6 years old
7+ years old
Durability
+ 80 years old
25-30 years old
50 years
Building responsibly: buildings with
zero impact for lasting value.
time.
Leaf System's commitment is to design buildings that not only respect the environment, but also create value
economically through efficiency. Our vision of zero-impact building is embodied in solutions
construction that minimize consumption and maximize comfort, ensuring a very high return
on the investment.
Energy Efficiency
Each building is designed to
achieve the best performance
energy performance (A4/NZEB). Thermal insulation reduces air conditioning and heating costs.
Sustainability of Materials
We use steel, a material
100% recyclable, and we adopt a
dry construction process that
minimizes water consumption and the
waste production on the construction site.
Healthiness and Comfort
We design healthy environments, protected from
radon gas and pollution
electromagnetic pollution, to ensure the
maximum well-being for those who will live or work
in the spaces we create.